PARIS 2024 OLYMPIC AQUATICS CENTER #1
PARIS 2024 OLYMPIC AQUATICS CENTER #1
PARIS 2024 OLYMPIC AQUATICS CENTER #3
PARIS 2024 OLYMPIC AQUATICS CENTER #3
PARIS 2024 OLYMPIC AQUATICS CENTER #4
PARIS 2024 OLYMPIC AQUATICS CENTER #4
PARIS 2024 OLYMPIC AQUATICS CENTER #5
PARIS 2024 OLYMPIC AQUATICS CENTER #5
PARIS 2024 OLYMPIC AQUATICS CENTER #6
PARIS 2024 OLYMPIC AQUATICS CENTER #6
PARIS 2024 OLYMPIC AQUATICS CENTER #7
PARIS 2024 OLYMPIC AQUATICS CENTER #7

PARIS 2024 OLYMPIC AQUATICS CENTER

SAINT-DENIS (93)

Client

Métropole du Grand Paris – Solideo

Project Management Team

Architects: Rougerie + Tangram, MAD Architects, Octant, Atelier PHILEAS, Representative : Opalia, Real Estate Developer: Demathieu Bard immobilier Builder: Legendre construction, Demathieu Bard construction, Landscaper: Signes Paysages, engineering : Ingerop, engineering Pool fluids: SOJA, engineering Acoustics : AC Acoustics Conseil

Surface area

20 174 sqm

Cost

170 M€HT
Assignment agreement

Competition

2019-2020

Distinction

Certification NF HQE – Sports equipment (swimming pools), exceptional level
Biodivercity label

Public service concession for the operation of the Plaine Saulnier Olympic aquatic center, including the design and construction of the facility and the design, construction, and maintenance of the adjacent pedestrian crossing over the A1 motorway.

A living, interactive and communicating architectural project. An architecture of water.